FY20 NAVSEA Standard Items Release Letter

FY20 NAVSEA Standard Items 01OCT2018

FY20 INDEX 


ITEM NO.



TITLE

UTILIZATION

CATEGORY


DATE

009-01

General Criteria; accomplish

I

01OCT2018

009-02

Environmental Compliance Report for Material Usage; accomplish

I

30APR2018

009-03

Toxic and Hazardous Substance; control

I

01OCT2017

009-04

Quality Management System; provide

I

01OCT2018

009-05

Temporary Access; accomplish

II

01OCT2018

009-06

Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

I

31AUG2018

009-07

Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I

01OCT2018

009-08

Shipboard Fire Protection and Fire Prevention; accomplish

I

31AUG2018

009-09

Process Control Procedure (PCP); provide and accomplish

II

01OCT2018

009-10

Asbestos-Containing Material (ACM); control

I

30APR2018

009-11

Insulation and Lagging; accomplish

II

01OCT2017

009-12

Weld, Fabricate, and Inspect; accomplish

II

01OCT2018

009-13

Meter, Gage, Switch, and Thermometer; repair

II

31AUG2018

009-14

Cancelled


    


009-15

Rotating Machinery; balance

II

18NOV2016

009-16

Electronic Equipment; repair

II

01OCT2018

009-17

Rotating Electrical Equipment; repair

II

31AUG2018

009-18

Mine Warfare Ships Magnetic Material; control

I

30APR2018

009-19

Provisioning Technical Documentation (PTD); provide

I

01OCT2018

009-20

Government Property; control

I

01OCT2017

009-21

Alteration Verification, Logistics and Technical Data; provide

I

01OCT2018

009-23

Interference; remove and install

I

01OCT2018

009-24

Authorization, Control, Isolation, Blanking, Tagging and Cleanliness; accomplish

I

01OCT2018

009-25

Structural Boundary Test; accomplish

II

01OCT2018

009-26

Deck Covering; accomplish

II

01OCT2018

009-27

Material Identification and Control (MIC) for Level I System; accomplish

II

06MAR2018

009-29

Cancelled


 

009-30

Boiler Sample Tube; inspect

II

18NOV2016

009-31

Boiler Waterjet Cleaning; accomplish

II

18JUL2014

009-32

Cleaning and Painting Requirements; accomplish

II

26MAR2018

009-33

Rotating Electrical Equipment; rewind

II

31AUG2018

009-34

Fire Protection of Unmanned Vessel at Contractor Facility; accomplish

I

01OCT2018

009-36

Controller; repair

II

31AUG2018

009-37

General Procedure for Woodwork; accomplish

II

01OCT2018

009-38

Boiler, Catapult Accumulator, and Reboiler Dry Lay-up; accomplish

II

01OCT2018

009-39

Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

I

01OCT2018

009-40

Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

I

01OCT2018

009-41

Cancelled


 

009-42

Cancelled


 

009-43

Cancelled


 

009-45

Tapered Plug Valve; repair

II

31AUG2018

009-46

Butterfly Valve, Synthetic and Metal Seated; repair

II

31AUG2018

009-47

Gate Valve; repair

II

31AUG2018

009-48

Pressure Seal Bonnet Valve Shop Repair; accomplish

II

31AUG2018

009-49

Pressure Seal Bonnet Valve In-line Repair; accomplish

II

31AUG2018

009-50

Horizontal Swing Check Valve; repair

II

31AUG2018

009-51

Cancelled


 

009-52

Relief Valve; repair

II

31AUG2018

009-53

Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve Shop Repair; accomplish

II

31AUG2018

009-54

Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve In-line Repair; accomplish

II

31AUG2018

009-55

Regulating/Reducing Valve; repair

II

31AUG2018

009-56

Main Propulsion Boiler Wet Lay-up; accomplish

II

01OCT2018

009-57

Reduction Gear Security;

accomplish

II

18NOV2016

009-58

Pump and Driver Shaft Alignment; accomplish

II

01OCT2018

009-59

Cancelled


 

009-60

Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

I

01OCT2018

009-61

Shipboard Use of Fluorocarbons; control

I

18JUL2014

009-62

Boiler Handhole, Manhole Seat and Plate; inspect

II

01OCT2018

009-63

Lubricating Oil and Hydraulic Fluid; analyze

II

30APR2018

009-64

Cancelled


 

009-65

Polychlorinated Biphenyls (PCBs); control

II

26MAR2018

009-67

Integrated Total Ship Testing; manage

I

30APR2018

009-68

Cancelled


 

009-69

Heavy Weather/Mooring Plan; provide

I

30APR2018

009-70

Confined Space Entry, Certification, Fire Protection, Fire Prevention, and Housekeeping for Unmanned Vessel; accomplish

I

01OCT2018

009-71

Piping System; test

II

31AUG 018

009-72

Physical Security at a Private Contractor Facility; accomplish

I

31AUG2018

009-73

Shipboard Electrical/Electronic

Cable Procedure; accomplish

I

01OCT2018

009-74

Occupational, Safety and Health Plan; accomplish

I

01OCT2018

009-75

Circuit Breaker; repair

II

31AUG2018

009-76

Waveguide and Rigid Coaxial Lay-Up; accomplish

II

01OCT2018

009-77

Cofferdam Installation; accomplish

II

01OCT2018

009-78

Passive Countermeasures System (PCMS) Material; repair

II

01OCT2018

009-79

Government Owned Material (GOM) Status for Multi-Ship Multi-Option availabilities; report

II

01OCT2018

009-80

Ship Facilities; maintain

I

18NOV2016

009-81

Compartment Closeout; accomplish

I

31AUG2018

009-82

Installation of Equal Component

Vice Specified Component; report

I

26MAR2018

009-83

Wire Rope Assembly; fabricate

II

26MAR2018

009-84

Threaded Fastener Requirements; accomplish

I

01OCT2018

009-85

Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide

II

19JUL2007

009-86

Recovery and Turn-In of Ozone Depleting Substance (ODS); accomplish

II

01OCT2017

009-87

Chemical Disinfection Procedure; accomplish

II

01OCT2017

009-88

Collection, Holding and Transfer (CHT) and Motor Gasoline(MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify

II

18NOV2016

009-89

Contractor Furnished Anode(Purchase and Inspection); accomplish

II

06MAR2018

009-90

Technical Representative; provide

II

26MAR2018

009-91

Propeller In-Place Inspection; accomplish

II

01OCT2017

009-92

Resilient Mount; install

II

30APR2018

009-93

Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

I

06MAR2018

009-94

Cancelled


 

009-95

Mechanically Attached Fitting (MAFs); install

II

01OCT2017

009-96

Ball Valve; repair

II

31AUG2018

009-97

Cancelled


 

009-99

Ship Departure Report; provide

I

18JUL2014

009-100

Ship's Stability; maintain

I

06MAR2018

009-101

Ship Transit and Berthing; accomplish

I

26MAR2018

009-102

Cancelled


 

009-103

Weight and Moment Change Data; provide

II

30APR2018

009-104

Vibration Testing and Analysis; accomplish

II

01OCT2018

009-105

Thermal Sprayed Coating for Machinery Component Repair; accomplish

II

01OCT2018

009-106

Work Authorization Form Coordinator (WAFCOR); provide

I

01OCT2017

009-107

Piping System Cleanliness Restoration and Flushing (Non-Nuclear); accomplish

II

01OCT2018

009-108

Cancelled


 

009-109

Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish

I

01OCT2017

009-110

Non-Nuclear Work on a Nuclear Vessel; accomplish

I

18NOV2016

009-111

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

I

30APR2018

009-112

Prevention of Radiographic-Inspection Ionizing-Radiation Hazard; accomplish


II

01OCT2018

009-113

Rotating Electrical Equipment with a Sealed Insulation System (SIS); rewind

II

31AUG2018

009-114

Mold Remediation; accomplish

II

01OCT2018

009-115

Bearing Rebabbitting; accomplish

II

30JUL2015

009-116

Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish

II

01OCT2018

009-117

Combat Systems Light-Off Support; provide

I

31AUG2018

009-118

CG Deck Loading; accomplish

I

18JUL2014

009-120

Fact Finding and Critique of Unplanned Event; manage

I

06MAR2018

009-121

Ship Assessment/Inspection; accomplish

II

18NOV2016

009-122

Temporary Padeye; install and remove

I

01OCT2018

009-123

Fiber Optic Component; remove, relocate, repair, and install

II

01OCT2018

009-124

Thermal Spray NonSkid Application;accomplish

II

01OCT2018