Download the PDF file
This section describes qualification and monitoring
requirements for Discrete Semiconductors. Use this section for Discrete
Semiconductor qualification or monitoring requirements.
General
Test conditions and
methods
For testing, use
MIL-STD-750 or equivalent JESD22 Test Methods. Other test methods or circuits
may be substituted if such a substitution in no way relaxes the
requirements.
Eliminate or reduce test
When a part
manufacturer elects to eliminate or reduce a test or 100% screen, by
substituting a process monitor or SPC, they are only relieved of the
responsibility of performing the test or 100 % screen. They are still
responsible for providing a product that meets the performance, quality, and
reliability requirements for the application. A part reliability program (study)
can replace all or any screening step or conformance inspection, when equivalent
to or compliant with application reliability requirement.
End-point electrical measurements
Measure and record
applicable (e.g., if deltas are required) end-point electrical measurements.
Replace pre-test end point failures with acceptable parts. Perform end-point
measurements before 96 hours unless specified.
Rework
Rework of sealed
packages shall be limited to re-cleaning, re-branding to correct defective
marking and lead straightening, re-plating or re-solder dipping of the
leads. After any re-plating, devices
shall pass as a 100 percent screen the requirements of Group A, subgroup 2 (DC
static-tests at 25°C) and the hermetic seal requirements (fine/gross leak) of
MIL-PRF-19500 and MIL-STD-750. In addition, rework shall be limited to the
following for wafers: additional etch to correct a nonconformance to a
specification limit; photoresist strip and recoat; additional processing to
continue or finish incomplete processing; strip and redeposit of non-junction
passivation or backside metallization.
Die and
Chips
Die and chips used in “normal” or “severe” environments shall
meet the minimal requirements for the JANHC level of QML-19500.
Part
Monitoring
Parts used in the “normal” and “severe” environment shall have
conformance testing or equivalent monitoring performed. Non-military parts shall
meet the MIL-PRF-19500 and/or the minimum application requirement. Recommend
using process control monitors for test and screen elimination. The manufacturer
shall have a process that meets or exceeds the requirements of groups A, B, and
C of MIL-PRF-19500.
Part
Qualification
When designing-in and/or qualifying Discrete Semiconductors
for “normal” or “severe” environments use the MIL-PRF-19500, JANTX level, as a
minimum. Qualification requirements for Plastic Discrete Semiconductors are in Table 1
.
Plastic parts used in the “normal” environment shall pass the requirements in Table 1,
as a minimum.
Table 1. Qualification Requirements for
Plastic Discrete Semiconductors
Inspection |
Test Condition |
1. Construction Analysis |
Sample 1 each |
|
|
2. Moisture Sensitivity |
J-STD-020 |
Classification (very small/thin surface unit packages
only) |
|
|
|
3. |
|
|
|
a.
External
visual |
|
|
|
b. Pre electrical
test including thermal impedance |
Monitor for electrical failure and electrical and thermal delta
shifts |
|
|
c.
Preconditioning |
JESD-22-A113A or equivalent |
|
|
d. Post electrical
test including thermal impedance |
Monitor for electrical failure and electrical and thermal delta
shifts |
|
|
4A. |
|
|
|
a. External
visual |
Monitor for electrical failure and electrical and thermal delta
shifts. |
|
|
b. Pre electrical
test including thermal impedance |
500 cycles, -65°C to +150°C |
|
|
c. Temperature
Cycling (TC) |
|
|
|
d. External
visual |
Monitor for electrical failure and electrical delta
shifts |
|
|
e. Pre electrical
test including thermal impedance |
|
|
|
4B. |
|
|
|
a. External
visual |
Monitor for electrical failure and electrical and thermal delta
shifts. |
|
|
b. Pre electrical
test including thermal impedance |
JESD22-A110-A |
|
|
c. Highly
Accelerated Stress |
|
|
|
Testing
(HAST) or equivalent |
|
|
|
d. External
visual |
Monitor for electrical failure and electrical and thermal delta
shifts |
|
|
e. Pre
electrical test including thermal impedance |
|
|
|
5. Perform failure analysis on all |
|
|
|