Home : Media : News
Results:
Tag: Team Ships

Ex-John F. Kennedy (CV 67) Embarks on Final Voyage
January 16, 2025
The ex-John F. Kennedy (CV 67) began its final journey this morning as it departed from the U.S. Navy’s Inactive Ships Maintenance Facility in Philadelphia, PA for transit to Brownsville, Texas where it will be dismantled.

Ex-USS John F. Kennedy to Commence Final Transit, Jan. 16
January 14, 2025
An aerial view of the attack carrier USS JOHN F. KENNEDY (CVA-67) underway in the Atlantic Ocean with aircraft on flight deck.

U.S Navy Accepts Delivery of USNS Robert F. Kennedy
December 11, 2024
SAN DIEGO – John Lewis-class fleet replenishment oiler, USNS Robert F. Kennedy (T-AO 208) delivered to the Navy on Dec. 10.

Navy Accepts Delivery of Ship to Shore Connector, Landing Craft, Air Cushion 111
December 9, 2024
NEW ORLEANS – The latest Ship to Shore Connector (SSC), LCAC 111 was delivered to the Navy from Textron Systems on Nov. 27.

Keel Laid for Future USNS Thurgood Marshall
December 5, 2024
USNS Thurgood Marshall (T-AO 211) Keel Laying Ceremony.

Keel Laid for Future USS Sam Nunn
November 22, 2024
Ingalls Shipbuilding Structural Welder Adam Lee welds the initials of ship sponsor Michelle Nunn and ship namesake Sam Nunn onto the keel plate that will be permanently part of Sam Nunn (DDG 133).

Navy Awards Amphibious Multi-Ship Procurement Contracts
September 24, 2024
The U.S. Navy awarded contracts totaling $9,472,132,620 for procurement of one America-class amphibious assault ship (LHA) and three San Antonio-class amphibious transport dock (LPD) ships, Sept. 24. The award, executed across two separate contracts to Huntington Ingalls Industries, Ingalls Shipbuilding Division, utilized a multi-ship procurement approach. By using this strategy, as authorized by Congress, the Navy is projected to achieve more than $901 million in cost avoidance as compared to the use of annual contracts.

Navy Awards T-AO Block Buy Contract
September 13, 2024
USNS Earl Warren (T-AO 207) during a testing event. The Navy accepted delivery of T-AO 207, May 7, following successful completion of Integrated Sea Trials.

Navy Accepts Delivery of Future USS Robert E. Simanek
September 13, 2024
Navy accepts delivery of future USS Robert E. Simanek (ESB 7), Sept. 12.

Navy Accepts Delivery of Ship to Shore Connector, Landing Craft, Air Cushion 110
September 6, 2024
The U.S. Navy accepted the delivery of the latest Ship to Shore Connector (SSC), LCAC 110, from Textron Systems on Sept. 6. This new addition to the fleet signifies a substantial enhancement in the Navy’s amphibious capabilities, providing a vital asset for rapid deployment and logistical support.