Home : Media : News
Results:
Tag: Team Ships

Keel Authenticated for Future USS Robert E. Simanek
October 24, 2022
The keel for the future USS Robert E. Simanek (ESB 7), a Lewis B. Puller-class Expeditionary Sea Base (ESB), was laid at General Dynamics National Steel and Shipbuilding Company (GD-NASSCO) shipyard in San Diego, October 21

Future USS Lenah Sutcliffe Higbee Completes Acceptance Trials
October 7, 2022

Keel Authenticated for the Future USNS Saginaw Ojibwe Anishinabek
October 5, 2022
The keel for the future USNS Saginaw Ojibwe Anishinabek (T-ATS 8) was ceremonially laid at Bollinger Houma Shipyards in Houma, LA, Oct. 3. Rear Adm. Tom Anderson, Program Executive Officer, Ships joined the Honorable Theresa Peters Jackson, Chief of the Saginaw Chippewa Tribe and other members of the tribe, as the keel was authenticated for their namesake ship.

Keel Authenticated for T-AGS 67
October 5, 2022
The keel of the next oceanographic survey ship (T-AGS 67) was ceremonially laid at Halter Marine in Pascagoula, MS, Oct. 4.  Here, Halter Marine welders etch names and the hull number into the keel plate.

The future USNS Apalachicola Achieves Milestones with Acceptance Trials and Completion of Unmanned Logistics Prototype Trials
September 9, 2022

Start of Fabrication Begins for Future USS Pittsburgh
September 8, 2022

Navy Accepts Delivery of Ship to Shore Connector, Landing Craft, Air Cushion 104
June 9, 2022
The Navy accepted delivery of the next generation landing craft, Ship to Shore Connector (SSC), Landing Craft, Air Cushion (LCAC) 104, June 9.

USNS John Lewis Conducts Acceptance Trials
May 2, 2022

Keel Authenticated for Future USNS Earl Warren (T-AO 207)
May 2, 2022

Keel Authenticated for Future USS John L. Canley
May 2, 2022