Home : Media : News
Results:
Category: HQ (NAVSEA HQ PAO USE ONLY), Team Ships

USNS Lewis B. Puller (MLP 3 AFSB) Delivers to Fleet
June 15, 2015
141106-N-EW716-001 SAN DIEGO (Nov. 6, 2014) The mobile landing platform Lewis B. Puller (T-MLP-3/T-AFSB-1) is the first afloat forward staging base (AFSB) variant of the MLP and is optimized to support a variety of maritime missions. (Photo courtesy of NASSCO)

Two from NSWC Indian Head recognized as 2014 Top Navy Scientist, Engineer
June 12, 2015
INDIAN HEAD, Maryland - Dr. Vasant Joshi, a senior materials scientist; and Dr. Greg Young, a propulsion engineer and program lead - both at  Naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division's (NSWC IHEODTD) - received the 2014 Dr. Delores M. Etter Award for Top Scientists and Engineers.

USNS Lewis B. Puller (MLP 3 AFSB) Delivers to Fleet
June 12, 2015

Digital voltage regulator saves money, helps control generator output
May 30, 2015

Davis Relieves Carlson as AEGIS Technical Representative Commanding Officer
May 29, 2015

Navy completes USS Harry S. Truman availability at NNSY
May 22, 2015
NORFOLK, Virginia - USS Harry S. Truman (CVN 75) heads to Norfolk Naval Shipyard (NNSY) for its Carrier Incremental Availability.

USS Freedom (LCS 1) Completes Rough Water Trials
May 21, 2015
Off the coast of Oregon: USS Freedom (LCS 1) recently completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT). Freedom, shown here during the RWT in late March, collected data while operating in Sea States 5 and 6 (approx. 8-20 foot waves). The machinery plant and auxiliaries all performed well in the context of sustained operations at sea.

Future USNS Brunswick (JHSV 6) Launched
May 19, 2015
MOBILE, Alabama - (May 19, 2015) - The Navy's newest Joint High Speed Vessel (JHSV 6), the future USNS Brunswick, was launched from the Austal USA shipyard.

Navy Lays Keel for PCU Indiana
May 18, 2015

Navy Announces Successful Test of Electromagnetic Catapult on CVN 78
May 15, 2015
Lt. Jared McCaleb, assigned to Pre-commissioning Unit Gerald R. Ford (CVN 78) Air Department, gives the launch signal during a full-speed "no load" test of the electromagnetic aircraft launch system (EMALS). The test marked a significant milestone in Ford's history as the ship prepares for commissioning in 2016. (U.S. Navy photo by Mass Communication Specialist 2nd Class Cory Rose/Released.