Home : Home : Shipyards : SIOP-old : SIOP Image Gallery

Image Gallery

Water is Pumped into Super Flood Basin
: KITTERY, ME. April 12, 2022, Portsmouth Naval Shipyard: Water is pumped into the newly constructed Super Flood Basin to support the historic first docking of an attack submarine in Dry Dock #1 without the use of buoyancy assist tanks and independent of the Piscataqua river tides. (U.S. Navy photo by Jim Cleveland/Released)

Photo by: Jim Cleveland |  VIRIN: 220412-N-TT535-001.JPG