Naval Sea Systems Command

 
DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE, DISTRIBUTION IS UNLIMITED.

The FY19 Standard Items and Standard Phraseology shall be invoked for all CNO availabilities with an availability start date in FY19 and in all other (Continuous Maintenance Availability (CMAV) and emergent) new procurements issued after 1 February 2015. 

Download FY 19 Package

FY19 NSI Promulgation Letter


NAVSEA Standard Items

Item No.

Title

Utilization Category

Date

INDEX

FY 19Standard Item Index

 

 

009-01

General Criteria; accomplish

I

01 OCT 2017

009-02

Environmental Compliance Report for Material Usage at Naval Facility; accomplish

I

18 NOV 2016

009-03

Toxic and Hazardous Substance; control

I

01 OCT 2017

009-04

Quality Management System; provide

I

01 OCT 2017

009-05

Temporary Access; accomplish

II

18 NOV 2016

009-06

Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

I

18 NOV 2016

009-07

Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I

01 OCT 2017

009-08

Shipboard Fire Protection and Fire Prevention; accomplish

I

01 OCT 2017

009-09

Process Control Procedure (PCP); provide and accomplish

II

01 OCT 2017

009-10

Asbestos-Containing Material (ACM); control

I

18 NOV 2016

009-11

Insulation and Lagging; accomplish

II

01 OCT 2017

009-12

Weld, Fabricate, and Inspect; accomplish

II

01 OCT 2017

009-13

Meter; repair

II

01 OCT 2017

009-14

Gage, Switch, and Thermometer; repair

II

01 OCT 2017

009-15

Rotating Machinery; balance

II

18 NOV 2016

009-16

Electronic Equipment; repair

II

18 NOV 2016

009-17

Rotating Electrical Equipment; repair

II

01 OCT 2017

009-18

Magnetic Material; control

I

07 MAR 2017

009-19

Provisioning Technical Documentation (PTD); provide

I

30 JUL 2015

009-20

Government Property; control

I

01 OCT 2017

009-21

Logistics and Technical Data; provide

I

01 OCT 2017

009-22

Canceled 18 NOV 2016

009-23

Interference; remove and install

I

01 OCT 2017

009-24

Authorization, Control, Isolation, Blanking, Tagging and Cleanliness; accomplish

I

01 OCT 2017

009-25

Structural Boundary Test; accomplish

II

01 OCT 2017

009-26

Deck Covering; accomplish

II

01 OCT 2017

009-27

Material Identification and Control (MIC) for Level I System; accomplish

II

18 NOV 2016

009-28

Canceled 18 NOV 2016

009-29

Asbestos‑Free Pipe Hanger Liner Material; install

I

29 JUL 2004

009-30

Boiler Sample Tube; inspect

II

18 NOV 2016

009-31

Boiler Waterjet Cleaning; accomplish

II

18 JUL 2014

009-32

Cleaning and Painting Requirements; accomplish

II

07 MAR 2017

009-33

Rotating Electrical Equipment; rewind

II

01 OCT 2017

009-34

Fire Protection of Unmanned Vessel at Contractor Facility; accomplish

I

18 NOV 2016

009-35

Canceled 18 NOV 2016

009-36

Controller; repair

II

01 OCT 2017

009-37

General Procedure for Woodwork; accomplish

II

01 OCT 2017

009-38

Boiler, Catapult Accumulator, and Reboiler Dry Lay-up; accomplish

II

18 NOV 2016

009-39

Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

I

18 NOV 2016

009-40

Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

I

01 OCT 2017

009-41

Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; accomplish

II

18 NOV 2016

009-42

Technical Manual Contract Requirement (TMCR) for Updating Technical Manual; accomplish

II

18 NOV 2016

009-43

Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide

II

30 JUL 2015

009-44

Cancelled18 JUL 2014

009-45

Tapered Plug Valve; repair

II

01 OCT 2017

009-46

Butterfly Valve, Synthetic and Metal Seated; repair

II

01 OCT 2017

009-47

Gate Valve; repair

II

01 OCT 2017

009-48

Pressure Seal Bonnet Valve Shop Repair; accomplish

II

01 OCT 2017

009-49

Pressure Seal Bonnet Valve In-line Repair; accomplish

II

01 OCT 2017

009-50

Horizontal Swing Check Valve; repair

II

01 OCT 2017

009-51

Globe, Globe Angle, and Globe Stop Check Valve; repair

II

01 OCT 2017

009-52

Relief Valve; repair

II

01 OCT 2017

009-53

Bolted Bonnet Steam Valve Shop Repair; accomplish

II

01 OCT 2017

009-54

Bolted Bonnet Steam Valve In-line Repair; accomplish

II

01 OCT 2017

009-55

Regulating/Reducing Valve; repair

II

01 OCT 2017

009-56

Main Propulsion Boiler Wet Lay-up; accomplish

II

18 NOV 2016

009-57

Reduction Gear Security;

accomplish

II

18 NOV 2016

009-58

Pump and Driver Shaft Alignment; accomplish

II

01 SEP 2015

009-59

Organotin Antifouling Material; control

II

18 NOV 2016

009-60

Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

I

01 OCT 2017

009-61

Shipboard Use of Fluorocarbons; control

I

18 JUL 2014

009-62

Boiler Handhole, Manhole Seat and Plate; inspect

II

18 NOV 2016

009-63

Lubricating Oil and Hydraulic Fluid; analyze

II

18 NOV 2016

009-64

Synthetic Fire Resistant Hydraulic Fluid; control

II

18 NOV 2016

009-65

Polychlorinated Biphenyls (PCBs); control

I

01 OCT 2017

009-66

Cancelled18 JUL 2014

009-67

Integrated Total Ship Testing; manage

I

01 OCT 2017

009-68

Bolted Bonnet Valve; repair

II

01 OCT 2017

009-69

Heavy Weather/Mooring Plan; provide

I

01 OCT 2017

009-70

Confined Space Entry, Certification, Fire Protection, Fire Prevention, and Housekeeping for Unmanned Vessel; accomplish

I

18 NOV 2016

009-71

Piping System; test

II

18 NOV 2016

009-72

Physical Security at a Private Contractor Facility; accomplish

I

01 OCT 2017

009-73

Shipboard Electrical/Electronic

Cable Procedure; accomplish

I

01 OCT 2017

009-74

Occupational, Safety and Health Plan; accomplish

I

01 OCT 2017

009-75

Circuit Breaker; repair

II

01 OCT 2017

009-76

Waveguide and Rigid Coaxial Lay-Up; accomplish

II

18 NOV 2016

009-77

Cofferdam Installation; accomplish

II

01 OCT 2017

009-78

Passive Countermeasures System (PCMS) Material; repair

II

18 NOV 2016

009-79

Government Owned Material (GOM) Status; report

I

18 NOV 2016

009-80

Ship Facilities; maintain

I

18 NOV 2016

009-81

Compartment Closeout; accomplish

I

01 OCT 2017

009-82

Installation of Equal Component

Vice Specified Component; report

I

18 NOV 2016

009-83

Wire Rope Assembly; fabricate

II

18 NOV 2016

009-84

Threaded Fastener Requirements; accomplish

I

01 OCT 2017

009-85

Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide

II

19 JUL 2007

009-86

Recovery and Turn-In of Ozone Depleting Substance (ODS); accomplish

II

18 NOV 2016

009-87

Chemical Disinfection Procedure; accomplish

II

01 OCT 2017

009-88

Collection, Holding and Transfer (CHT) and Motor Gasoline(MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify

II

18 NOV 2016

009-89

Contractor Furnished Anode(Purchase and Inspection); accomplish

I

01 OCT 2017

009-90

Technical Representative; provide

II

01 OCT 2017

009-91

Propeller In-Place Inspection; accomplish

II

01 OCT 2017

009-92

Resilient Mount; install

II

18 NOV 2016

009-93

Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

I

18 NOV 2016

009-94

General Environmental Work at Contractor Facility; accomplish

I

18 NOV 2016

009-95

Mechanically Attached Fitting (MAFs); install

II

01 OCT 2017

009-96

Ball Valve; repair

II

01 OCT 2017

009-97

Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

I

17 JAN 2013

009-98

Canceled 18 NOV 2016

009-99

Ship Departure Report; provide

I

18 JUL 2014

009-100

Ship's Stability; maintain

I

01 OCT 2017

009-101

Ship Transit and Berthing; accomplish

I

18 NOV 2016

009-102

Alteration Verification; provide

I

01 OCT 2017

009-103

Weight and Moment Change Data; provide

I

18 JUL 2014

009-104

Vibration Testing and Analysis; accomplish

II

01 OCT 2017

009-105

Thermal Sprayed Coating for Machinery Component Repair; accomplish

II

01 OCT 2017

009-106

Work Authorization Form Coordinator (WAFCOR); provide

I

01 OCT 2017

009-107

Piping System Cleanliness Restoration (Non-Nuclear); accomplish

II

01 OCT 2017

009-108

Aircraft Carrier Transit and Berthing; accomplish

I

18 NOV 2016

009-109

Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish

I

01 OCT 2017

009-110

Non-Nuclear Work on a Nuclear Vessel; accomplish

I

18 NOV 2016

009-111

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

I

18 NOV 2016

009-112

Prevention of Radiographic-Inspection Ionizing-Radiation Hazard; accomplish

II

18 NOV 2016

009-113

Rotating Electrical Equipment with a Sealed Insulation System (SIS); rewind

II

01 OCT 2017

009-114

Mold Remediation; accomplish

II

07 NOV 2013

009-115

Bearing Rebabbitting; accomplish

II

30 JUL 2015

009-116

Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish

II

30 JUL 2015

009-117

Combat Systems Light-Off; support

I

18 NOV 2016

009-118

CG Deck Loading; accomplish

I

18 JUL 2014

009-119

Cancelled 18 JUL 2014

009-120

Fact Finding and Critique of Unplanned Event; manage

I

01 OCT 2017

009-121

Ship Assessment/Inspection;accomplish

II

18 NOV 2016

009-122

Temporary Padeye; install and remove

I

01 OCT 2017

009-123

Fiber Optic Component; remove, relocate, repair, and install

II

01 OCT 2017

 

Staying Connected