Naval Sea Systems Command

 

 

DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE, DISTRIBUTION IS UNLIMITED.

The FY-18 Standard Items and Standard Phraseology shall be invoked for all CNO availabilities with an availability start date in FY-18 and in all other (CMAV and emergent) new procurements issued after 01 March 2017.


FY 18 Release Letter

 

NAVSEA STANDARD ITEMS

 

ITEM NO.

 

 

TITLE

UTILIZATION

CATEGORY

 

 

DATE

INDEX

FY17 (CH-1) Standard Item Index

 

 

 

009-01

General Criteria; accomplish

I

 

18 NOV 2016

009-02

Environmental Compliance Report for Material Usage at Naval Facility; accomplish

I

 

18 NOV 2016

009-03

Toxic and Hazardous Substance; control

I

 

18 NOV 2016

009-04

Quality Management System; provide

I

 

18 NOV 2016

009-05

Temporary Access; accomplish

II

 

18 NOV 2016

009-06

Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

I

 

18 NOV 2016

009-07

Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I

 

18 NOV 2016

009-08

Shipboard Fire Protection; | accomplish

I

 

18 NOV 2016

009-09

Process Control Procedure (PCP); provide and accomplish

II

 

18 NOV 2016

009-10

Asbestos-Containing Material (ACM); control|

I

 

18 NOV 2016

009-11

Insulation and Lagging; accomplish|

II

 

18 NOV 2016

009-12

Weld, Fabricate, and Inspect; accomplish|

II

 

18 NOV 2016

009-13

Meter; repair|

II

 

18 NOV 2016

009-14

Gage, Switch, and Thermometer; repair|

II

 

18 NOV 2016

009-15

Rotating Machinery; balance

II

 

18 NOV 2016

009-16

Electronic Equipment; repair

II

 

18 NOV 2016

009-17

Rotating Electrical Equipment; repair

II

 

18 NOV 2016

009-18

Magnetic Material; control

II

 

18 NOV 2016

009-19

Provisioning Technical Documentation (PTD); provide

I

 

30 JUL 2015

009-20

Government Property; control

I

 

18 JUL 2014

009-21

Logistics and Technical Data; provide

I

 

18 JUL 2014

009-22

Canceled 18 NOV 2016

 

 

 

009-23

Interference; remove and install|

I

 

18 NOV 2016

009-24

Authorization, Control, Isolation, Blanking, Tagging and Cleanliness; accomplish |

I

 

18 NOV 2016

009-25

Structural Boundary Test; accomplish

II

 

18 NOV 2016

009-26

Deck Covering; accomplish |

II

 

18 NOV 2016

009-27

Material Identification and Control (MIC) for Level I System; accomplish|

II

 

18 NOV 2016

009-28

Canceled 18 NOV 2016

 

 

 

009-29

Asbestos‑Free Pipe Hanger Liner Material; install

I

 

29 JUL 2004

009-30

Boiler Sample Tube; inspect|

II

 

18 NOV 2016

009-31

Boiler Waterjet Cleaning; accomplish

II

 

18 JUL 2014

009-32

Cleaning and Painting Requirements; accomplish

II

 

12 MAY 2016

009-33

Rotating Electrical Equipment; rewind

II

 

18 NOV 2016

009-34

Fire Protection of Unmanned Vessel at Contractor Facility; accomplish

I

 

18 NOV 2016

009-35

Canceled 18 NOV 2016

 

 

 

009-36

Controller; repair

II

 

18 NOV 2016

009-37

General Procedure for Woodwork; accomplish

II

 

18 NOV 2016

009-38

Boiler, Catapult Accumulator, and Reboiler Dry Lay-up; accomplish

II

 

18 NOV 2016

009-39

Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

I

 

18 NOV 2016

009-40

Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

I

 

18 NOV 2016

009-41

Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; accomplish

II

 

18 NOV 2016

009-42

Technical Manual Contract Requirement (TMCR) for Updating Technical Manual; accomplish

II

 

18 NOV 2016

009-43

Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide

II

 

30 JUL 2015

009-44

Cancelled 18 JUL 2014

 

 

 

009-45

Tapered Plug Valve; repair

II

 

18 NOV 2016

009-46

Butterfly Valve, Synthetic and Metal Seated; repair

II

 

18 JUL 2014

009-47

Gate Valve; repair

II

 

18 NOV 2016

009-48

Pressure Seal Bonnet Valve Shop Repair; accomplish

II

 

18 NOV 2016

009-49

Pressure Seal Bonnet Valve In-line Repair; accomplish

II

 

18 NOV 2016

009-50

Horizontal Swing Check Valve; repair

II

 

18 NOV 2016

009-51

Globe, Globe Angle, and Globe Stop Check Valve; repair

II

 

18 NOV 2016

009-52

Relief Valve; repair

II

 

18 NOV 2016

009-53

Bolted Bonnet Steam Valve Shop Repair; accomplish

II

 

18 NOV 2016

009-54

Bolted Bonnet Steam Valve In-line Repair; accomplish

II

 

18 NOV 2016

009-55

Regulating/Reducing Valve; repair

II

 

18 NOV 2016

009-56

Main Propulsion Boiler Wet Lay-up; accomplish

II

 

18 NOV 2016

009-57

Reduction Gear Security;|

accomplish

II

 

18 NOV 2016

009-58

Pump and Driver Shaft Alignment; accomplish

II

 

01 SEP 2015

009-59

Organotin Antifouling Material; control

II

 

18 NOV 2016

009-60

Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

I

 

01 SEP 2015

009-61

Shipboard Use of Fluorocarbons; control

I

 

18 JUL 2014

009-62

Boiler Handhole, Manhole Seat and Plate; inspect|

II

 

18 NOV 2016

009-63

Lubricating Oil and Hydraulic Fluid; analyze|

II

 

18 NOV 2016

009-64

Synthetic Fire Resistant Hydraulic Fluid; control

II

 

18 NOV 2016

009-65

Polychlorinated Biphenyls (PCBs); control

I

 

29 JUL 2011

009-66

Cancelled 18 JUL 2014

 

 

 

009-67

Integrated Total Ship Testing; manage

I

 

18 NOV 2016

009-68

Bolted Bonnet Valve; repair

II

 

29 JUL 2011

009-69

Heavy Weather/Mooring Plan; provide

I

 

18 NOV 2016

009-70

Confined Space Entry, Certification, Fire Protection, Fire Prevention, and Housekeeping for Unmanned Vessel; accomplish

I

 

18 NOV 2016

009-71

Piping System; test|

II

 

18 NOV 2016

009-72

Physical Security at a Private Contractor Facility; accomplish |

I

 

18 NOV 2016

009-73

Shipboard Electrical/Electronic

Cable Procedure; accomplish|

I

 

18 NOV 2016

009-74

Occupational, Safety and Health Plan; accomplish

I

 

18 NOV 2016

009-75

Circuit Breaker; repair

II

 

18 NOV 2016

009-76

Waveguide and Rigid Coaxial Lay-Up; accomplish

II

 

18 NOV 2016

009-77

Cofferdam Installation; accomplish

II

 

18 NOV 2016

009-78

Passive Countermeasures System (PCMS) Material; repair|

II

 

18 NOV 2016

009-79

Government Owned Material (GOM) Status; report

I

 

18 NOV 2016

009-80

Ship Facilities; maintain

I

 

18 NOV 2016

009-81

Compartment Closeout; accomplish

I

 

18 NOV 2016

009-82

Installation of Equal Component |

Vice Specified Component; report

I

 

18 NOV 2016

009-83

Wire Rope Assembly; fabricate |

II

 

18 NOV 2016

009-84

Threaded Fastener Requirements; accomplish

II

 

18 NOV 2016

009-85

Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide

II

 

19 JUL 2007

009-86

Recovery and Turn-In of Ozone Depleting Substance (ODS); accomplish

II

 

18 NOV 2016

009-87

Chemical Disinfection Procedure; accomplish

II

 

18 NOV 2016

009-88

Collection, Holding and Transfer (CHT) and Motor Gasoline(MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify

II

 

18 NOV 2016

009-89

Contractor Furnished Anode(Purchase and Inspection); accomplish

I

 

18 NOV 2016

009-90

Technical Representative; provide

II

 

18 JUL 2014

009-91

Propeller In-Place Inspection; accomplish

II

 

18 NOV 2016

009-92

Resilient Mount; install|

II

 

18 NOV 2016

009-93

Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

I

 

18 NOV 2016

009-94

General Environmental Work at Contractor Facility; accomplish |

I

 

18 NOV 2016

009-95

Mechanically Attached Fitting (MAFs); install |

II

 

18 NOV 2016

009-96

Ball Valve; repair

II

 

18 NOV 2016

009-97

Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

I

 

17 JAN 2013

009-98

Cancelled 18 NOV 2016

 

 

 

009-99

Ship Departure Report; provide

I

 

18 JUL 2014

009-100

Ship's Stability; maintain|

I

 

18 NOV 2016

009-101

Ship Transit and Berthing; accomplish

I

 

18 NOV 2016

009-102

Alteration Verification; provide

I

 

29 JUL 2011

009-103

Weight and Moment Change Data; provide

I

 

18 JUL 2014

009-104

Vibration Testing and Analysis; accomplish

II

 

18 JUL 2014

009-105

Thermal Sprayed Coating for Machinery Component Repair; accomplish

II

 

18 NOV 2016

009-106

Work Authorization Form Coordinator (WAFCOR); provide

I

 

18 NOV 2016

009-107

Piping System Cleanliness Restoration (Non-Nuclear); accomplish

II

 

18 NOV 2016

009-108

Aircraft Carrier Transit and Berthing; accomplish

I

 

18 NOV 2016

009-109

Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish |

I

 

18 NOV 2016

009-110

Non-Nuclear Work on a Nuclear Vessel; accomplish |

I

 

18 NOV 2016

009-111

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

I

 

18 NOV 2016

009-112

Prevention of Radiographic-Inspection Ionizing-Radiation Hazard; accomplish|

 

II

 

18 NOV 2016

009-113

Rotating Electrical Equipment with a Sealed Insulation System (SIS); rewind

II

 

18 NOV 2016

009-114

Mold Remediation; accomplish

II

 

07 NOV 2013

009-115

Bearing Rebabbitting; accomplish

II

 

30 JUL 2015

009-116

Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish

II

 

30 JUL 2015

009-117

Combat Systems Light-Off; support

I

 

18 NOV 2016

009-118

CG Deck Loading; accomplish

I

 

18 JUL 2014

009-119

Cancelled 18 JUL 2014

 

 

 

009-120

Fact Finding and Critique of Unplanned Event; manage|

I

 

18 NOV 2016

009-121

Ship Assessment/Inspection;| accomplish

II

 

18 NOV 2016

009-122

Temporary Padeye; install and remove

I

 

18 NOV 2016

009-123

Fiber Optic Component; remove, relocate, repair, and install

II

 

18 NOV 2016

 


Staying Connected