DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE, DISTRIBUTION IS UNLIMITED.

The FY-18 Standard Items and Standard Phraseology shall be invoked in work items not yet planned for CNO availabilities with an availability start date in FY-18 and in all other (CMAV and emergent) new procurements issued after 01 March 2017.  Work items that have been previously planned utilizing FY-17 Standard Items and Standard Phraseology, only need updated to reflect the FY-18 items that incorporate technical changes and/or are required by CNRMC.

FY18(CH-2) Promlugation Letter

FY18 (CH-2) Standard Items

Promulgation Letter REV 1 FY18 (CH-1)

Promulgation Letter FY-18 (CH-1)

FY-18 (CH-1) Standard Items

FY 18 Release Letter Update One

FY 18 Release Letter

Download FY18 NSI Package

Download FY18 Appendix 4E Package 

 

NAVSEA STANDARD ITEMS

 

ITEM NO.

 

 

TITLE

UTILIZATION

CATEGORY

 

 

DATE

INDEX

FY18 (CH-2) Standard Item Index

 

 

 

009-01

General Criteria; accomplish

I

 

18 NOV 2016

009-02

Environmental Compliance Report for Material Usage at Naval Facility; accomplish

I

 

18 NOV 2016

009-03

Toxic and Hazardous Substance; control

I

 

18 NOV 2016

009-04

Quality Management System; provide

I

 

18 NOV 2016

009-05

Temporary Access; accomplish

II

 

18 NOV 2016

009-06

Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

I

 

18 NOV 2016

009-07

Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I

 

18 NOV 2016

009-08

Shipboard Fire Protection; | accomplish

I

 

18 NOV 2016

 009-08

CH-1

 Shipboard Fire Protection and Fire Prevention; accomplish

 I   07 MAR 2017 

009-09

Process Control Procedure (PCP); provide and accomplish

II

 

18 NOV 2016

009-10

Asbestos-Containing Material (ACM); control|

I

 

18 NOV 2016

009-11

Insulation and Lagging; accomplish|

II

 

18 NOV 2016

009-12

Weld, Fabricate, and Inspect; accomplish|

II

 

18 NOV 2016

009-13

Meter; repair|

II

 

18 NOV 2016

009-14

Gage, Switch, and Thermometer; repair|

II

 

18 NOV 2016

009-15

Rotating Machinery; balance

II

 

18 NOV 2016

009-16

Electronic Equipment; repair

II

 

18 NOV 2016

009-17

Rotating Electrical Equipment; repair

II

 

18 NOV 2016

009-18

Magnetic Material; control

II

 

18 NOV 2016

 009-18

CH-1

 Magnetic Material; control I    07 MAR 2017

009-19

Provisioning Technical Documentation (PTD); provide

I

 

30 JUL 2015

009-20

Government Property; control

I

 

18 JUL 2014

009-21

Logistics and Technical Data; provide

I

 

18 JUL 2014

009-22

Canceled 18 NOV 2016

 

 

 

009-23

Interference; remove and install|

I

 

18 NOV 2016

009-24

Authorization, Control, Isolation, Blanking, Tagging and Cleanliness; accomplish |

I

 

18 NOV 2016

 009-24
 CH-2
 Authorization, Control, Isolation, Blanking, Tagging and Cleanliness; accomplish  I   01 OCT 2017

009-25

Structural Boundary Test; accomplish

II

 

18 NOV 2016

009-26

Deck Covering; accomplish |

II

 

18 NOV 2016

 009-26

CH-1

 Deck Covering; accomplish II   07 MAR 2017 

009-27

Material Identification and Control (MIC) for Level I System; accomplish|

II

 

18 NOV 2016

009-28

Canceled 18 NOV 2016

 

 

 

009-29

Asbestos‑Free Pipe Hanger Liner Material; install

I

 

29 JUL 2004

009-30

Boiler Sample Tube; inspect|

II

 

18 NOV 2016

009-31

Boiler Waterjet Cleaning; accomplish

II

 

18 JUL 2014

009-32

Cleaning and Painting Requirements; accomplish

II

 

12 MAY 2016

 009-32

CH-1

Cleaning and Painting Requirements; accomplish  II   07 MAR 2017 

009-33

Rotating Electrical Equipment; rewind

II

 

18 NOV 2016

 009-33
CH-2
Rotating Electrical Equipment; rewind  II    01 OCT 2017

009-34

Fire Protection of Unmanned Vessel at Contractor Facility; accomplish

I

 

18 NOV 2016

009-35

Canceled 18 NOV 2016

 

 

 

009-36

Controller; repair

II

 

18 NOV 2016

009-37

General Procedure for Woodwork; accomplish

II

 

18 NOV 2016

009-38

Boiler, Catapult Accumulator, and Reboiler Dry Lay-up; accomplish

II

 

18 NOV 2016

009-39

Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

I

 

18 NOV 2016

009-40

Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

I

 

18 NOV 2016

009-41

Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; accomplish

II

 

18 NOV 2016

009-42

Technical Manual Contract Requirement (TMCR) for Updating Technical Manual; accomplish

II

 

18 NOV 2016

009-43

Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide

II

 

30 JUL 2015

009-44

Cancelled 18 JUL 2014

 

 

 

009-45

Tapered Plug Valve; repair

II

 

18 NOV 2016

009-46

Butterfly Valve, Synthetic and Metal Seated; repair

II

 

18 JUL 2014

009-47

Gate Valve; repair

II

 

18 NOV 2016

009-48

Pressure Seal Bonnet Valve Shop Repair; accomplish

II

 

18 NOV 2016

009-49

Pressure Seal Bonnet Valve In-line Repair; accomplish

II

 

18 NOV 2016

009-50

Horizontal Swing Check Valve; repair

II

 

18 NOV 2016

009-51

Globe, Globe Angle, and Globe Stop Check Valve; repair

II

 

18 NOV 2016

009-52

Relief Valve; repair

II

 

18 NOV 2016

009-53

Bolted Bonnet Steam Valve Shop Repair; accomplish

II

 

18 NOV 2016

009-54

Bolted Bonnet Steam Valve In-line Repair; accomplish

II

 

18 NOV 2016

009-55

Regulating/Reducing Valve; repair

II

 

18 NOV 2016

009-56

Main Propulsion Boiler Wet Lay-up; accomplish

II

 

18 NOV 2016

009-57

Reduction Gear Security;|

accomplish

II

 

18 NOV 2016

009-58

Pump and Driver Shaft Alignment; accomplish

II

 

01 SEP 2015

009-59

Organotin Antifouling Material; control

II

 

18 NOV 2016

009-60

Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

I

 

01 SEP 2015

009-61

Shipboard Use of Fluorocarbons; control

I

 

18 JUL 2014

009-62

Boiler Handhole, Manhole Seat and Plate; inspect|

II

 

18 NOV 2016

009-63

Lubricating Oil and Hydraulic Fluid; analyze|

II

 

18 NOV 2016

009-64

Synthetic Fire Resistant Hydraulic Fluid; control

II

 

18 NOV 2016

009-65

Polychlorinated Biphenyls (PCBs); control

I

 

29 JUL 2011

009-66

Cancelled 18 JUL 2014

 

 

 

009-67

Integrated Total Ship Testing; manage

I

 

18 NOV 2016

009-68

Bolted Bonnet Valve; repair

II

 

29 JUL 2011

009-69

Heavy Weather/Mooring Plan; provide

I

 

18 NOV 2016

009-70

Confined Space Entry, Certification, Fire Protection, Fire Prevention, and Housekeeping for Unmanned Vessel; accomplish

I

 

18 NOV 2016

009-71

Piping System; test|

II

 

18 NOV 2016

009-72

Physical Security at a Private Contractor Facility; accomplish |

I

 

18 NOV 2016

 009-72
CH-2
 Physical Security at a Private Contractor Facility; accomplish  I    01 OCT 2017

009-73

Shipboard Electrical/Electronic

Cable Procedure; accomplish|

I

 

18 NOV 2016

009-74

Occupational, Safety and Health Plan; accomplish

I

 

18 NOV 2016

009-75

Circuit Breaker; repair

II

 

18 NOV 2016

009-76

Waveguide and Rigid Coaxial Lay-Up; accomplish

II

 

18 NOV 2016

009-77

Cofferdam Installation; accomplish

II

 

18 NOV 2016

009-78

Passive Countermeasures System (PCMS) Material; repair|

II

 

18 NOV 2016

009-79

Government Owned Material (GOM) Status; report

I

 

18 NOV 2016

009-80

Ship Facilities; maintain

I

 

18 NOV 2016

009-81

Compartment Closeout; accomplish

I

 

18 NOV 2016

009-82

Installation of Equal Component |

Vice Specified Component; report

I

 

18 NOV 2016

009-83

Wire Rope Assembly; fabricate |

II

 

18 NOV 2016

009-84

Threaded Fastener Requirements; accomplish

II

 

18 NOV 2016

009-85

Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide

II

 

19 JUL 2007

009-86

Recovery and Turn-In of Ozone Depleting Substance (ODS); accomplish

II

 

18 NOV 2016

009-87

Chemical Disinfection Procedure; accomplish

II

 

18 NOV 2016

009-88

Collection, Holding and Transfer (CHT) and Motor Gasoline(MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify

II

 

18 NOV 2016

009-89

Contractor Furnished Anode(Purchase and Inspection); accomplish

I

 

18 NOV 2016

009-90

Technical Representative; provide

II

 

18 JUL 2014

009-91

Propeller In-Place Inspection; accomplish

II

 

18 NOV 2016

009-92

Resilient Mount; install|

II

 

18 NOV 2016

009-93

Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

I

 

18 NOV 2016

009-94

General Environmental Work at Contractor Facility; accomplish |

I

 

18 NOV 2016

009-95

Mechanically Attached Fitting (MAFs); install |

II

 

18 NOV 2016

009-96

Ball Valve; repair

II

 

18 NOV 2016

009-97

Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

I

 

17 JAN 2013

009-98

Cancelled 18 NOV 2016

 

 

 

009-99

Ship Departure Report; provide

I

 

18 JUL 2014

009-100

Ship's Stability; maintain|

I

 

18 NOV 2016

009-101

Ship Transit and Berthing; accomplish

I

 

18 NOV 2016

009-102

Alteration Verification; provide

I

 

29 JUL 2011

009-103

Weight and Moment Change Data; provide

I

 

18 JUL 2014

009-104

Vibration Testing and Analysis; accomplish

II

 

18 JUL 2014

009-105

Thermal Sprayed Coating for Machinery Component Repair; accomplish

II

 

18 NOV 2016

009-106

Work Authorization Form Coordinator (WAFCOR); provide

I

 

18 NOV 2016

 009-106
CH-2
 Work Authorization Form Coordinator (WAFCOR); provide  I    01 OCT 2017

009-107

Piping System Cleanliness Restoration (Non-Nuclear); accomplish

II

 

18 NOV 2016

009-108

Aircraft Carrier Transit and Berthing; accomplish

I

 

18 NOV 2016

009-109

Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish |

I

 

18 NOV 2016

009-110

Non-Nuclear Work on a Nuclear Vessel; accomplish |

I

 

18 NOV 2016

009-111

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

I

 

18 NOV 2016

009-112

Prevention of Radiographic-Inspection Ionizing-Radiation Hazard; accomplish|

 

II

 

18 NOV 2016

009-113

Rotating Electrical Equipment with a Sealed Insulation System (SIS); rewind

II

 

18 NOV 2016

 009-113
CH2
 Rotating Electrical Equipment with a Sealed Insulation System (SIS); rewind  II    01 OCT 2017

009-114

Mold Remediation; accomplish

II

 

07 NOV 2013

009-115

Bearing Rebabbitting; accomplish

II

 

30 JUL 2015

009-116

Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish

II

 

30 JUL 2015

009-117

Combat Systems Light-Off; support

I

 

18 NOV 2016

009-118

CG Deck Loading; accomplish

I

 

18 JUL 2014

009-119

Cancelled 18 JUL 2014

 

 

 

009-120

Fact Finding and Critique of Unplanned Event; manage|

I

 

18 NOV 2016

009-121

Ship Assessment/Inspection;| accomplish

II

 

18 NOV 2016

009-122

Temporary Padeye; install and remove

I

 

18 NOV 2016

009-123

Fiber Optic Component; remove, relocate, repair, and install

II

 

18 NOV 2016