NAVSEA STANDARD ITEMS
FY-13 (CH-4)
14 DEC 2012
Save form and attach to an e-mail to ssrac@navy.mil
|
ITEM NO. |
TITLE |
UTILIZATION CATEGORY |
DATE |
|
|
General Criteria;
accomplish |
I |
29 JUL 2011 |
||
|
Environmental
Compliance Reports for Material Usage at Naval Facilities; provide |
I |
29 JUL 2011 |
||
|
Toxic and Hazardous
Substances; control |
I |
29 JUL 2011 |
||
|
Quality Management
System; provide |
I |
29 JUL 2011 |
||
|
Temporary Accesses;
provide |
I |
29 JUL 2011 |
||
|
Maintaining Protection
and Cleanliness from Non-Radioactive Contaminate-Producing Operations;
accomplish |
I |
29 JUL 2011 |
||
|
(CH-2) |
Maintaining Protection
and Cleanliness from Non-Radioactive Contaminate-Producing Operations;
accomplish |
I |
15 JUN 2012 |
|
|
(CH-3) |
Maintaining Protection
and Cleanliness from Non-Radioactive Contaminate-Producing Operations; accomplish |
I |
17 OCT 2012 |
|
|
Confined Space Entry,
Certification, Fire Prevention and Housekeeping; accomplish |
I |
29 JUL 2011 |
||
|
(CH-2) |
Confined Space Entry,
Certification, Fire Prevention and Housekeeping; accomplish |
I |
15 JUN 2012 |
|
|
(CH-3) |
Confined Space Entry,
Certification, Fire Prevention and Housekeeping; accomplish |
I |
17 OCT 2012 |
|
|
(CH-4) |
Confined Space Entry,
Certification, Fire Prevention and Housekeeping; accomplish |
I |
14 DEC 2012 |
|
|
Fire Protection at
Contractor's Facility; accomplish |
I |
29 JUL 2011 |
||
|
(CH-2) |
Fire Protection at
Contractor's Facility; accomplish |
I |
15 JUN 2012 |
|
|
(CH-3) |
Fire Protection at
Contractor's Facility; accomplish |
I |
17 OCT 2012 |
|
|
Process Control
Procedure (PCP); provide and accomplish |
II |
29 JUL 2011 |
||
|
Shipboard
Asbestos-Containing Material (ACM); control |
I |
29 JUL 2011 |
||
|
Insulation and Lagging
Requirements; accomplish |
II |
29 JUL 2011 |
||
|
Welding, Fabrication,
and Inspection Requirements; accomplish |
II |
29 JUL 2011 |
||
|
Meters; repair and
certify calibration |
II |
29 JUL 2011 |
||
|
Gages and
Thermometers; repair and certify calibration |
II |
29 JUL 2011 |
||
|
Rotating Machinery;
balance |
II |
29 JUL 2011 |
||
|
Electronic Equipment;
repair |
II |
29 JUL 2011 |
||
|
Rotating Electrical
Equipment; repair |
II |
29 JUL 2011 |
||
|
Magnetic Material;
control |
I |
29 JUL 2011 |
||
|
Provisioning Technical
Documentation (PTD); provide |
I |
29 JUL 2011 |
||
|
Government Property;
control |
I |
29 JUL 2011 |
||
|
Logistics and
Technical Data; provide |
I |
29 JUL 2011 |
||
|
Shipboard Electric
Cable; test |
II |
29 JUL 2011 |
||
|
Interferences; remove
and install |
I |
29 JUL 2011 |
||
|
Authorization,
Control, Isolation, Blanking, and Tagging Requirements; accomplish |
I |
29 JUL 2011 |
||
|
(CH-1) |
Authorization, Control,
Isolation, Blanking, and Tagging Requirements; accomplish |
I |
08 DEC 2011 |
|
|
Structural Boundary
Test; accomplish |
II |
29 JUL 2011 |
||
|
Deck Covering Requirements;
accomplish |
II |
29 JUL 2011 |
||
|
Material
Identification and Control (MIC) for Level I Systems; accomplish |
II |
29 JUL 2011 |
||
|
009-28 |
Cancelled 30 JUL 2010 |
|
|
|
|
Asbestos-Free Pipe
Hanger Liner Material; install |
I |
29 JUL 2004 |
||
|
Boiler Sample Tubes;
inspect |
II |
29 JUL 2011 |
||
|
Boiler Waterjet Cleaning; accomplish |
II |
29 JUL 2011 |
||
|
Cleaning and Painting
Requirements; accomplish |
II |
31 JAN 2011 |
||
|
Rotating Electrical
Equipment; rewind |
II |
29 JUL 2011 |
||
|
Fire Protection of
Unmanned Vessels at Contractor's Facility; provide |
I |
24 JUL 2009 |
||
|
(CH-2) |
Fire Protection of Unmanned
Vessels at Contractor's Facility; provide |
I |
15 JUN 2012 |
|
|
Confined Space Entry,
Certification, Fire Prevention Utilizing Military Fire Watches, and
Housekeeping; accomplish |
I |
29 JUL 2011 |
||
|
(CH-2) |
Confined Space Entry,
Certification, Fire Prevention Utilizing Military Fire Watches, and
Housekeeping; accomplish |
I |
15 JUN 2012 |
|
|
(CH-3) |
Confined Space Entry,
Certification, Fire Prevention Utilizing Military Fire Watches, and
Housekeeping; accomplish |
I |
17 OCT 2013 |
|
|
Controller; repair |
II |
29 JUL 2011 |
||
|
General Procedures for
Woodwork; accomplish |
II |
30 JUL 2010 |
||
|
Boiler Dry Lay-up;
accomplish |
II |
29 JUL 2011 |
||
|
Technical Manual
Contract Requirement (TMCR) for New Technical
Manuals for Commercial Equipment/Component; provide |
I |
19 JUL 2007 |
||
|
Requirements for
Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at
Naval Facilities; accomplish |
I |
29 JUL 2011 |
||
|
Technical Manual
Contract Requirement (TMCR) for a Topically
Structured Technical Manual; provide |
II |
19 JUL 2007 |
||
|
Technical Manual
Contract Requirement (TMCR) for Updating Technical
Manuals; provide |
II |
19 JUL 2007 |
||
|
Light-Off Assessment
(LOA) Support for Steam Propulsion System; provide |
II |
29 JUL 2011 |
||
|
Light-Off Assessment
(LOA) Support for Gas Turbine Propulsion System; provide |
II |
29 JUL 2011 |
||
|
Tapered Plug Valve;
repair |
II |
29 JUL 2011 |
||
|
Butterfly Valve,
Synthetic and Metal Seated; repair |
II |
29 JUL 2011 |
||
|
Gate Valve; repair |
II |
29 JUL 2011 |
||
|
Pressure Seal Bonnet
Valve; repair (shop) |
II |
29 JUL 2011 |
||
|
Pressure Seal Bonnet
Valve; repair (in-line) |
II |
29 JUL 2011 |
||
|
Horizontal Swing Check
Valve; repair |
II |
29 JUL 2011 |
||
|
Globe, Globe Angle,
and Globe Stop Check Valve; repair |
II |
29 JUL 2011 |
||
|
Relief Valve; repair |
II |
29 JUL 2011 |
||
|
Bolted Bonnet Steam
Valve; repair (shop) |
II |
29 JUL 2011 |
||
|
Bolted Bonnet Steam
Valve; repair (in-line) |
II |
30 JUL 2010 |
||
|
Regulating/Reducing
Valve; repair |
II |
30 JUL 2010 |
||
|
Main Propulsion Boiler
Wet Lay-up; accomplish |
II |
29 JUL 2011 |
||
|
Reduction Gear
Security Requirements; accomplish |
II |
29 JUL 2011 |
||
|
(CH-1) |
Reduction Gear
Security Requirements; accomplish |
II |
08 DEC 2011 |
|
|
Pump and Driver Shaft
Alignment; accomplish |
II |
29 JUL 2011 |
||
|
Organotin
Antifouling Materials; control |
I |
29 JUL 2011 |
||
|
Schedule and
Associated Reports for Availabilities Over 9 Weeks in Duration; provide and
manage |
I |
29 JUL 2011 |
||
|
Shipboard Use of
Fluorocarbons; control |
I |
24 JUL 2009 |
||
|
Boiler Handhole and Manhole Seats and Plates; inspect |
II |
29 JUL 2011 |
||
|
Lubricating Oils and
Hydraulic Fluids; analyze |
II |
29 JUL 2011 |
||
|
Synthetic Fire
Resistant Hydraulic Fluid; control |
I |
29 JUL 2011 |
||
|
Polychlorinated
Biphenyls (PCBs); control |
I |
29 JUL 2011 |
||
|
Light-Off Assessment
(LOA) Support for Diesel Propulsion System; provide |
II |
29 JUL 2011 |
||
|
Integrated Total Ship
Testing; manage |
I |
29 JUL 2011 |
||
|
Bolted Bonnet Valve;
repair |
II |
29 JUL 2011 |
||
|
Heavy Weather Plan;
provide |
I |
29 JUL 2011 |
||
|
(CH-2) |
Heavy Weather Plan;
provide |
I |
15 JUN 2012 |
|
|
Confined Space Entry,
Certification, Fire Prevention and Housekeeping for Unmanned Vessels;
accomplish |
I |
29 JUL 2011 |
||
|
(CH-2) |
Confined Space Entry, Certification,
Fire Prevention and Housekeeping for Unmanned Vessels; accomplish |
I |
15 JUN 2012 |
|
|
(CH-3) |
Confined Space Entry,
Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish |
I |
17 OCT 2012 |
|
|
Testing Requirements
for Piping Systems; accomplish |
II |
30 JUL 2010 |
||
|
Physical Security at
Private Contractor's Facility; accomplish |
I |
29 JUL 2011 |
||
|
Shipboard
Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and
install |
I |
29 JUL 2011 |
||
|
Occupational, Safety and
Health Requirements; accomplish |
I |
29 JUL 2011 |
||
|
(CH-3) |
Occupational, Safety
and Health Requirements; accomplish |
I |
17 OCT 2012 |
|
|
Circuit Breaker;
repair |
II |
29 JUL 2011 |
||
|
Waveguide and
Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish |
II |
29 JUL 2011 |
||
|
Cofferdam
Requirements; accomplish |
I |
29 JUL 2011 |
||
|
Passive
Countermeasures System (PCMS) Material
Repair/Installation Requirements; accomplish |
II |
30 JUL 2010 |
||
|
Government Owned
Material (GOM); status reporting |
I |
29 JUL 2011 |
||
|
Ship's Facilities;
provide |
I |
29 JUL 2011 |
||
|
Compartment Closeout;
accomplish |
I |
29 JUL 2011 |
||
|
Data Requirements When
Installing an Equal Component Vice Specified Component; provide |
I |
29 JUL 2011 |
||
|
Wire Rope Fitting
Verification; provide |
I |
29 JUL 2011 |
||
|
Accountability of
Temporary Fasteners; provide |
I |
29 JUL 2011 |
||
|
Government Sponsored
Planning Yard/Configuration Data Manager (CDM) On-Site
Representative Facility; provide |
II |
19 JUL 2007 |
||
|
Recovery of
Chlorofluorocarbon (CFC's) and Fire Suppressant Halon
(H) Materials; accomplish |
I |
01 AUG 2008 |
||
|
Chemical Disinfection
Procedures; accomplish |
I |
29 JUL 2011 |
||
|
Collection, Holding
and Transfer (CHT) and Mogas
Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated
Tanks, Spaces, and Piping; certify |
I |
29 JUL 2011 |
||
|
Purchase and
Inspection Requirements for Contractor Furnished Anodes; accomplish |
I |
29 JUL 2011 |
||
|
Technical Representative;
provide |
II |
29 JUL 2011 |
||
|
Propeller In-Place
Inspection; accomplish |
II |
29 JUL 2011 |
||
|
Resilient Mount;
remove and install |
II |
29 JUL 2011 |
||
|
Emergency Planning and
Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide |
I |
29 JUL 2011 |
||
|
General Environmental Requirements
for Work at Contractor's Facility; accomplish |
I |
29 JUL 2011 |
||
|
Mechanically Attached
Fittings (MAFs) for Piping Systems; install |
I |
29 JUL 2011 |
||
|
Ball Valve; repair |
II |
29 JUL 2011 |
||
|
Ship Building and Ship
Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide |
I |
29 JUL 2011 |
||
|
Monel
Fasteners; inspect |
II |
30 JUL 2010 |
||
|
Ship Departure Report;
provide |
I |
30 JUL 2010 |
||
|
Ship's Stability Process
Control Procedure (PCP); maintain |
I |
30 JUL 2010 |
||
|
Requirements for
Mooring, Entry to, and Departure from Contractor's Facility; accomplish |
I |
29 JUL 2011 |
||
|
Alteration
Verification; provide |
I |
29 JUL 2011 |
||
|
Weight and Moment
Change Data; provide |
I |
29 JUL 2011 |
||
|
Vibration Testing and
Analysis; accomplish |
II |
29 JUL 2011 |
||
|
Thermal Sprayed
Coatings for Machinery Component Repair; accomplish |
II |
14 JUL 2005 |
||
|
Work Authorization
Form Coordinator (WAFCOR); provide |
I |
30 JUL 2010 |
||
|
Piping
System Cleanliness (Non-Nuclear); accomplish |
II |
29 JUL 2011 |
||
|
Aircraft
Carrier Requirements for Mooring, Entry to, Movement within, and Departure
from Contractor's Facility; accomplish |
I |
29 JUL 2011 |
||
|
Special
Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish |
I |
29 JUL 2011 |
||
|
Special
Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish |
I |
29 JUL 2011 |
||
|
Schedule and Associated
Reports for Availabilities 9 Weeks or Less in Duration; provide and manage |
I |
29 JUL 2011 |
||
|
Prevention of
Radiographic-Inspection Ionizing-Radiation Hazards; accomplish |
I |
29 JUL 2011 |
||
|
Rotating Electrical
equipment with Sealed Insulation Systems (SIS); rewind |
II |
29 JUL 2011 |
||
|
Mold Remediation;
accomplish |
II |
30 JUL 2010 |
||
|
Bearing Rebabbitting; accomplish |
II |
29 JUL 2011 |
||
|
Auxiliary and Waste
Heat Boiler Sodium Nitrite Wet Lay-up; accomplish |
II |
29 JUL 2011 |
||
|
AEGIS Light-Off (ALO) Support for AEGIS Weapons Systems; provide |
II |
29 JUL 2011 |
||
|
SSRAC STANDARD WORK TEMPLATES |
||||
|
Hazardous Waste Produced
On Naval Vessels; control |
29 JUL 2011 |
|||
|
Cleaning and Pumping;
accomplish |
29 JUL 2011 |
|||