|
DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE, DISTRIBUTION IS UNLIMITED. |
NAVSEA STANDARD ITEMS
FY-13 (CH-1)
08 DEC 2011
Save form and attach to an e-mail to ssrac@navy.mil
| Category I Standard Item Index - by Trade |
| Category II Standard Item Index - by Trade |
| Download FY-13 Standard Item Package (includes Change One) |
| ITEM NO. | TITLE |
UTILIZATION CATEGORY |
DATE |
|
| 009-01 | General Criteria; accomplish |
I |
29 JUL 2011 | |
| 009-02 | Environmental Compliance Reports for Material Usage at Naval Facilities; provide |
I |
29 JUL 2011 | |
| 009-03 | Toxic and Hazardous Substances; control |
I |
29 JUL 2011 | |
| 009-04 | Quality Management System; provide |
I |
29 JUL 2011 | |
| 009-05 | Temporary Accesses; provide |
I |
29 JUL 2011 | |
| 009-06 | Maintaining Protection and Cleanliness from Non-Radioactive Contaminate-Producing Operations; accomplish |
I |
29 JUL 2011 | |
| 009-07 | Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish |
I |
29 JUL 2011 | |
| 009-08 | Fire Protection at Contractor's Facility; accomplish |
I |
29 JUL 2011 | |
| 009-09 | Process Control Procedure (PCP); provide and accomplish |
II |
29 JUL 2011 | |
| 009-10 | Shipboard Asbestos-Containing Material (ACM); control |
I |
29 JUL 2011 | |
| 009-11 | Insulation and Lagging Requirements; accomplish |
II |
29 JUL 2011 | |
| 009-12 | Welding, Fabrication, and Inspection Requirements; accomplish |
II |
29 JUL 2011 | |
| 009-13 | Meters; repair and certify calibration |
II |
29 JUL 2011 | |
| 009-14 | Gages and Thermometers; repair and certify calibration |
II |
29 JUL 2011 | |
| 009-15 | Rotating Machinery; balance |
II |
29 JUL 2011 | |
| 009-16 | Electronic Equipment; repair |
II |
29 JUL 2011 | |
| 009-17 | Rotating Electrical Equipment; repair |
II |
29 JUL 2011 | |
| 009-18 | Magnetic Material; control |
I |
29 JUL 2011 | |
| 009-19 | Provisioning Technical Documentation (PTD); provide |
I |
29 JUL 2011 | |
| 009-20 | Government Property; control |
I |
29 JUL 2011 | |
| 009-21 | Logistics and Technical Data; provide |
I |
29 JUL 2011 | |
| 009-22 | Shipboard Electric Cable; test |
II |
29 JUL 2011 | |
| 009-23 | Interferences; remove and install |
I |
29 JUL 2011 | |
| 009-24 | Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish |
I |
29 JUL 2011 | |
| 009-24 (CH-1) | Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish |
I |
08 DEC 2011 | |
| 009-25 | Structural Boundary Test; accomplish |
II |
29 JUL 2011 | |
| 009-26 | Deck Covering Requirements; accomplish |
II |
29 JUL 2011 | |
| 009-27 | Material Identification and Control (MIC) for Level I Systems; accomplish |
II |
29 JUL 2011 | |
| 009-28 | Cancelled 30 JUL 2010 |
|
||
| 009-29 | Asbestos-Free Pipe Hanger Liner Material; install |
I |
29 JUL 2004 | |
| 009-30 | Boiler Sample Tubes; inspect |
II |
29 JUL 2011 | |
| 009-31 | Boiler Waterjet Cleaning; accomplish |
II |
29 JUL 2011 | |
| 009-32 | Cleaning and Painting Requirements; accomplish |
II |
31 JAN 2011 | |
| 009-33 | Rotating Electrical Equipment; rewind |
II |
29 JUL 2011 | |
| 009-34 | Fire Protection of Unmanned Vessels at Contractor's Facility; provide |
I |
24 JUL 2009 | |
| 009-35 | Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish |
I |
29 JUL 2011 | |
| 009-36 | Controller; repair |
II |
29 JUL 2011 | |
| 009-37 | General Procedures for Woodwork; accomplish |
II |
30 JUL 2010 | |
| 009-38 | Boiler Dry Lay-up; accomplish |
II |
29 JUL 2011 | |
| 009-39 | Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide |
I |
19 JUL 2007 | |
| 009-40 | Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish |
I |
29 JUL 2011 | |
| 009-41 | Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; provide |
II |
19 JUL 2007 | |
| 009-42 | Technical Manual Contract Requirement (TMCR) for Updating Technical Manuals; provide |
II |
19 JUL 2007 | |
| 009-43 | Light-Off Assessment (LOA) Support for Steam Propulsion System; provide |
II |
29 JUL 2011 | |
| 009-44 | Light-Off Assessment (LOA) Support for Gas Turbine Propulsion System; provide |
II |
29 JUL 2011 | |
| 009-45 | Tapered Plug Valve; repair |
II |
29 JUL 2011 | |
| 009-46 | Butterfly Valve, Synthetic and Metal Seated; repair |
II |
29 JUL 2011 | |
| 009-47 | Gate Valve; repair |
II |
29 JUL 2011 | |
| 009-48 | Pressure Seal Bonnet Valve; repair (shop) |
II |
29 JUL 2011 | |
| 009-49 | Pressure Seal Bonnet Valve; repair (in-line) |
II |
29 JUL 2011 | |
| 009-50 | Horizontal Swing Check Valve; repair |
II |
29 JUL 2011 | |
| 009-51 | Globe, Globe Angle, and Globe Stop Check Valve; repair |
II |
29 JUL 2011 | |
| 009-52 | Relief Valve; repair |
II |
29 JUL 2011 | |
| 009-53 | Bolted Bonnet Steam Valve; repair (shop) |
II |
29 JUL 2011 | |
| Bolted Bonnet Steam Valve; repair (in-line) |
II |
30 JUL 2010 | ||
| 009-55 | Regulating/Reducing Valve; repair |
II |
30 JUL 2010 | |
| 009-56 | Main Propulsion Boiler Wet Lay-up; accomplish |
II |
29 JUL 2011 | |
| 009-57 | Reduction Gear Security Requirements; accomplish |
II |
29 JUL 2011 | |
| 009-57 (CH-1) | Reduction Gear Security Requirements; accomplish |
II |
08 DEC 2011 | |
| 009-58 | Pump and Driver Shaft Alignment; accomplish |
II |
29 JUL 2011 | |
| 009-59 | Organotin Antifouling Materials; control |
I |
29 JUL 2011 | |
| 009-60 | Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage |
I |
29 JUL 2011 | |
| 009-61 | Shipboard Use of Fluorocarbons; control |
I |
24 JUL 2009 | |
| 009-62 | Boiler Handhole and Manhole Seats and Plates; inspect |
II |
29 JUL 2011 | |
| 009-63 | Lubricating Oils and Hydraulic Fluids; analyze |
II |
29 JUL 2011 | |
| 009-64 | Synthetic Fire Resistant Hydraulic Fluid; control |
I |
29 JUL 2011 | |
| 009-65 | Polychlorinated Biphenyls (PCBs); control |
I |
29 JUL 2011 | |
| 009-66 | Light-Off Assessment (LOA) Support for Diesel Propulsion System; provide |
II |
29 JUL 2011 | |
| 009-67 | Integrated Total Ship Testing; manage |
I |
29 JUL 2011 | |
| 009-68 | Bolted Bonnet Valve; repair |
II |
29 JUL 2011 | |
| 009-69 | Heavy Weather Plan; provide |
I |
29 JUL 2011 | |
| 009-70 | Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish |
I |
29 JUL 2011 | |
| 009-71 | Testing Requirements for Piping Systems; accomplish |
II |
30 JUL 2010 | |
| 009-72 | Physical Security at Private Contractor's Facility; accomplish |
I |
29 JUL 2011 | |
| 009-73 | Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install |
I |
29 JUL 2011 | |
| 009-74 | Occupational, Safety and Health Requirements; accomplish |
I |
29 JUL 2011 | |
| 009-75 | Circuit Breaker; repair |
II |
29 JUL 2011 | |
| 009-76 | Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish |
II |
29 JUL 2011 | |
| 009-77 | Cofferdam Requirements; accomplish |
I |
29 JUL 2011 | |
| 009-78 | Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish |
II |
30 JUL 2010 | |
| 009-79 | Government Owned Material (GOM); status reporting |
I |
29 JUL 2011 | |
| 009-80 | Ship's Facilities; provide |
I |
29 JUL 2011 | |
| 009-81 | Compartment Closeout; accomplish |
I |
29 JUL 2011 | |
| 009-82 | Data Requirements When Installing an Equal Component Vice Specified Component; provide |
I |
29 JUL 2011 | |
| 009-83 | Wire Rope Fitting Verification; provide |
I |
29 JUL 2011 | |
| 009-84 | Accountability of Temporary Fasteners; provide |
I |
29 JUL 2011 | |
| 009-85 | Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide |
II |
19 JUL 2007 | |
| 009-86 | Recovery of Chlorofluorocarbon (CFC's) and Fire Suppressant Halon (H) Materials; accomplish |
I |
01 AUG 2008 | |
| 009-87 | Chemical Disinfection Procedures; accomplish |
I |
29 JUL 2011 | |
| 009-88 | Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify |
I |
29 JUL 2011 | |
| 009-89 | Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish |
I |
29 JUL 2011 | |
| 009-90 | Technical Representative; provide |
II |
29 JUL 2011 | |
| 009-91 | Propeller In-Place Inspection; accomplish |
II |
29 JUL 2011 | |
| 009-92 | Resilient Mount; remove and install |
II |
29 JUL 2011 | |
| 009-93 | Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide |
I |
29 JUL 2011 | |
| 009-94 | General Environmental Requirements for Work at Contractor's Facility; accomplish |
I |
29 JUL 2011 | |
| 009-95 | Mechanically Attached Fittings (MAFs) for Piping Systems; install |
I |
29 JUL 2011 | |
| 009-96 | Ball Valve; repair |
II |
29 JUL 2011 | |
| 009-97 | Ship Building and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide |
I |
29 JUL 2011 | |
| 009-98 | Monel Fasteners; inspect |
II |
30 JUL 2010 | |
| 009-99 | Ship Departure Report; provide |
I |
30 JUL 2010 | |
| 009-100 | Ship's Stability Process Control Procedure (PCP); maintain |
I |
30 JUL 2010 | |
| 009-101 | Requirements for Mooring, Entry to, and Departure from Contractor's Facility; accomplish |
I |
29 JUL 2011 | |
| 009-102 | Alteration Verification; provide |
I |
29 JUL 2011 | |
| 009-103 | Weight and Moment Change Data; provide |
I |
29 JUL 2011 | |
| 009-104 | Vibration Testing and Analysis; accomplish |
II |
29 JUL 2011 | |
| 009-105 | Thermal Sprayed Coatings for Machinery Component Repair; accomplish |
II |
14 JUL 2005 | |
| 009-106 | Work Authorization Form Coordinator (WAFCOR); provide |
I |
30 JUL 2010 | |
| 009-107 | Piping System Cleanliness (Non-Nuclear); accomplish | II | 29 JUL 2011 | |
| 009-108 | Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor's Facility; accomplish | I | 29 JUL 2011 | |
| 009-109 | Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish | I | 29 JUL 2011 | |
| 009-110 | Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish | I | 29 JUL 2011 | |
| 009-111 | Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage | I | 29 JUL 2011 | |
| 009-112 | Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish | I | 29 JUL 2011 | |
| 009-113 | Rotating Electrical equipment with Sealed Insulation Systems (SIS); rewind | II | 29 JUL 2011 | |
| 009-114 | Mold Remediation; accomplish | II | 30 JUL 2010 | |
| 009-115 | Bearing Rebabbitting; accomplish |
II |
29 JUL 2011 | |
| 009-116 | Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish |
II |
29 JUL 2011 | |
| 009-117 | AEGIS Light-Off (ALO) Support for AEGIS Weapons Systems; provide | II | 29 JUL 2011 | |
| SSRAC STANDARD WORK TEMPLATES | ||||
| 077-01 | Hazardous Waste Produced On Naval Vessels; control | 29 JUL 2011 | ||
| 992-31 | Cleaning and Pumping; accomplish | 29 JUL 2011 | ||