NAVSEA STANDARD ITEMS

FY-13 (CH-1)

08 DEC 2011

Get a SSRAC ProposalForm

Save form and attach to an e-mail to ssrac@navy.mil

Category I Standard Item Index - by Trade
Category II Standard Item Index - by Trade

Download FY-13 SI Package

Download FY-13 Standard Item Package (includes Change One)
ITEM NO. TITLE

UTILIZATION CATEGORY

DATE

009-01 General Criteria; accomplish

I

29 JUL 2011
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide

I

29 JUL 2011
009-03 Toxic and Hazardous Substances; control

I

29 JUL 2011
009-04 Quality Management System; provide

I

29 JUL 2011
009-05 Temporary Accesses; provide

I

29 JUL 2011
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Contaminate-Producing Operations; accomplish

I

29 JUL 2011
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I

29 JUL 2011
009-08 Fire Protection at Contractor's Facility; accomplish

I

29 JUL 2011
009-09 Process Control Procedure (PCP); provide and accomplish

II

29 JUL 2011
009-10 Shipboard Asbestos-Containing Material (ACM); control

I

29 JUL 2011
009-11 Insulation and Lagging Requirements; accomplish

II

29 JUL 2011
009-12 Welding, Fabrication, and Inspection Requirements; accomplish

II

29 JUL 2011
009-13 Meters; repair and certify calibration

II

29 JUL 2011
009-14 Gages and Thermometers; repair and certify calibration

II

29 JUL 2011
009-15 Rotating Machinery; balance

II

29 JUL 2011
009-16 Electronic Equipment; repair

II

29 JUL 2011
009-17 Rotating Electrical Equipment; repair

II

29 JUL 2011
009-18 Magnetic Material; control

I

29 JUL 2011
009-19 Provisioning Technical Documentation (PTD); provide

I

29 JUL 2011
009-20 Government Property; control

I

29 JUL 2011
009-21 Logistics and Technical Data; provide

I

29 JUL 2011
009-22 Shipboard Electric Cable; test

II

29 JUL 2011
009-23 Interferences; remove and install

I

29 JUL 2011
009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish

I

29 JUL 2011
009-24    (CH-1) Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish

I

08 DEC 2011
009-25 Structural Boundary Test; accomplish

II

29 JUL 2011
009-26 Deck Covering Requirements; accomplish

II

29 JUL 2011
009-27 Material Identification and Control (MIC) for Level I Systems; accomplish

II

29 JUL 2011
009-28 Cancelled 30 JUL 2010

 

 
009-29 Asbestos-Free Pipe Hanger Liner Material; install

I

29 JUL 2004
009-30 Boiler Sample Tubes; inspect

II

29 JUL 2011
009-31 Boiler Waterjet Cleaning; accomplish

II

29 JUL 2011
009-32    Cleaning and Painting Requirements; accomplish

II

31 JAN 2011
009-33 Rotating Electrical Equipment; rewind

II

29 JUL 2011
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide

I

24 JUL 2009
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

I

29 JUL 2011
009-36 Controller; repair

II

29 JUL 2011
009-37 General Procedures for Woodwork; accomplish

II

30 JUL 2010
009-38 Boiler Dry Lay-up; accomplish

II

29 JUL 2011
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide

I

19 JUL 2007
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

I

29 JUL 2011
009-41 Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; provide

II

19 JUL 2007
009-42 Technical Manual Contract Requirement (TMCR) for Updating Technical Manuals; provide

II

19 JUL 2007
009-43 Light-Off Assessment (LOA) Support for Steam Propulsion System; provide

II

29 JUL 2011
009-44 Light-Off Assessment (LOA) Support for Gas Turbine Propulsion System; provide

II

29 JUL 2011
009-45 Tapered Plug Valve; repair

II

29 JUL 2011
009-46 Butterfly Valve, Synthetic and Metal Seated; repair

II

29 JUL 2011
009-47 Gate Valve; repair

II

29 JUL 2011
009-48 Pressure Seal Bonnet Valve; repair (shop)

II

29 JUL 2011
009-49 Pressure Seal Bonnet Valve; repair (in-line)

II

29 JUL 2011
009-50 Horizontal Swing Check Valve; repair

II

29 JUL 2011
009-51 Globe, Globe Angle, and Globe Stop Check Valve; repair

II

29 JUL 2011
009-52 Relief Valve; repair

II

29 JUL 2011
009-53 Bolted Bonnet Steam Valve; repair (shop)

II

29 JUL 2011

009-54

Bolted Bonnet Steam Valve; repair (in-line)

II

30 JUL 2010
009-55 Regulating/Reducing Valve; repair

II

30 JUL 2010
009-56 Main Propulsion Boiler Wet Lay-up; accomplish

II

29 JUL 2011
009-57 Reduction Gear Security Requirements; accomplish

II

29 JUL 2011
009-57    (CH-1) Reduction Gear Security Requirements; accomplish

II

08 DEC 2011
009-58 Pump and Driver Shaft Alignment; accomplish

II

29 JUL 2011
009-59 Organotin Antifouling Materials; control

I

29 JUL 2011
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

I

29 JUL 2011
009-61 Shipboard Use of Fluorocarbons; control

I

24 JUL 2009
009-62 Boiler Handhole and Manhole Seats and Plates; inspect

II

29 JUL 2011
009-63 Lubricating Oils and Hydraulic Fluids; analyze

II

29 JUL 2011
009-64 Synthetic Fire Resistant Hydraulic Fluid; control

I

29 JUL 2011
009-65 Polychlorinated Biphenyls (PCBs); control

I

29 JUL 2011
009-66 Light-Off Assessment (LOA) Support for Diesel Propulsion System; provide

II

29 JUL 2011
009-67 Integrated Total Ship Testing; manage

I

29 JUL 2011
009-68 Bolted Bonnet Valve; repair

II

29 JUL 2011
009-69 Heavy Weather Plan; provide

I

29 JUL 2011
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

I

29 JUL 2011
009-71 Testing Requirements for Piping Systems; accomplish

II

30 JUL 2010
009-72 Physical Security at Private Contractor's Facility; accomplish

I

29 JUL 2011
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install

I

29 JUL 2011
009-74 Occupational, Safety and Health Requirements; accomplish

I

29 JUL 2011
009-75 Circuit Breaker; repair

II

29 JUL 2011
009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish

II

29 JUL 2011
009-77 Cofferdam Requirements; accomplish

I

29 JUL 2011
009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

II

30 JUL 2010
009-79 Government Owned Material (GOM); status reporting

I

29 JUL 2011
009-80 Ship's Facilities; provide

I

29 JUL 2011
009-81 Compartment Closeout; accomplish

I

29 JUL 2011
009-82 Data Requirements When Installing an Equal Component Vice Specified Component; provide

I

29 JUL 2011
009-83 Wire Rope Fitting Verification; provide

I

29 JUL 2011
009-84 Accountability of Temporary Fasteners; provide

I

29 JUL 2011
009-85 Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide

II

19 JUL 2007
009-86 Recovery of Chlorofluorocarbon (CFC's) and Fire Suppressant Halon (H) Materials; accomplish

I

01 AUG 2008
009-87 Chemical Disinfection Procedures; accomplish

I

29 JUL 2011
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

I

29 JUL 2011
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish

I

29 JUL 2011
009-90 Technical Representative; provide

II

29 JUL 2011
009-91 Propeller In-Place Inspection; accomplish

II

29 JUL 2011
009-92 Resilient Mount; remove and install

II

29 JUL 2011
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

I

29 JUL 2011
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish

I

29 JUL 2011
009-95 Mechanically Attached Fittings (MAFs) for Piping Systems; install

I

29 JUL 2011
009-96 Ball Valve; repair

II

29 JUL 2011
009-97 Ship Building and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide

I

29 JUL 2011
009-98 Monel Fasteners; inspect

II

30 JUL 2010
009-99 Ship Departure Report; provide

I

30 JUL 2010
009-100 Ship's Stability Process Control Procedure (PCP); maintain

I

30 JUL 2010
009-101 Requirements for Mooring, Entry to, and Departure from Contractor's Facility; accomplish

I

29 JUL 2011
009-102 Alteration Verification; provide

I

29 JUL 2011
009-103 Weight and Moment Change Data; provide

I

29 JUL 2011
009-104 Vibration Testing and Analysis; accomplish

II

29 JUL 2011
009-105 Thermal Sprayed Coatings for Machinery Component Repair; accomplish

II

14 JUL 2005
009-106 Work Authorization Form Coordinator (WAFCOR); provide

I

30 JUL 2010
009-107 Piping System Cleanliness (Non-Nuclear); accomplish II 29 JUL 2011
009-108 Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor's Facility; accomplish I 29 JUL 2011
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish I 29 JUL 2011
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish I 29 JUL 2011
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage I 29 JUL 2011
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish I 29 JUL 2011
009-113 Rotating Electrical equipment with Sealed Insulation Systems (SIS); rewind II 29 JUL 2011
009-114 Mold Remediation; accomplish II 30 JUL 2010
009-115 Bearing Rebabbitting; accomplish

II

29 JUL 2011
009-116 Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish

II

29 JUL 2011
009-117 AEGIS Light-Off (ALO) Support for AEGIS Weapons Systems; provide II 29 JUL 2011
SSRAC STANDARD WORK TEMPLATES
077-01 Hazardous Waste Produced On Naval Vessels; control 29 JUL 2011
992-31 Cleaning and Pumping; accomplish 29 JUL 2011